GENERAL NEWS

Government Awards Contract For Construction of New Bridge At Otokporlu

The Ghana Highways Authority boss in the Eastern Region has made a public statement saying a 12 months contract has been awarded to Joshob Construction Limited (JCL) to construct a new steel bridge at Otokporlu in the Yilo Krobo Municipality

How the final work will look like (Outlook)

The project is part of the 50 bridges ear marked to be funded from the €47m Czech Republic loan facility contracted in December, 2018 after parliament approval

In line with this, the project design document reads, “Modular steel bridges substructure drawings for Oterkporlu Bridge (Kpong Odumase Oterkporlu).

Detail Designs

Mr. Charles Adubofuor speaking to Rite FM earlier on Friday at a site visit to Otopkorlu to brief stakeholders about the project assured residents and the general public there was going to be quality work since Broad Consult, a firm responsible to supervise the work is capable enough to do effective supervision.

Hons. Ebenezer Tetteh Kupualor and Simon Kweku Tetteh, Municipal Chief Executives for Yilo and Manya Krobo respectively were joined by Mr. Emmanuel Owusu Ansah of Joshob Construction Limited, Mr. Michael Okaine of Broad Consult, the Director of Eastern Regional Highways Authority, Mr. Charles Adubofuor and the local media for site and project briefing visit on Friday, 26 March, 2021.

The first 5 officials from left to right are: Hon. E.T. Kupualor, Mr. Michael Okain, Mr. Adubofuor Emmanuel, Hon. Simon Tetteh and Mr. Emmanuel Owusu Ansah.

For the rainy season, the main bridge work on the river shall begin later while 50m distance away from the bridge road network starts immediately.

The bridge will come with a cement block work erected from within the river with steel metal covering the top for vehicular passageway and a two-lane walk-way. It will be higher than the current bridge.

“The good thing about this project is that the contractor is being giving reinforcement and cement while the JCL pays for labor cost. This just to keep the price down and help them mobilize faster,” Mr. Michael Okaine to the media when JCL’s representative Mr. Emmanuel Owusu Ansah was asked to expedite action to meet the timeline.

The contractor is tasked to engineer the adjoining links of the bridge from and to Odumase and Oterkporlu township respectively.

State of the bridge

Even though there is a contract sum, the consultant Mr. Michael Okaine declined response to a question regarding how much the work will cost the tax payer.

In a related development, a bring in Okwenya also in the Yilo Krobo Municipality is also under reconstruction by a different constructing firm, Asabea Engineering Limited.

Show More

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Close